PMKVY Training Partner Skilled Girls with Designer Paper Bags CSR: Free Computer Education

PMKVY Training Partner

Apply for PMKVY Training Centre

Skilled Girls with Designer Paper Bags

Sulabh Sanitation Mission Foundation and Vivid Foundation join hands to run nurture widows and orphans at Tanda UP

CSR: Free Computer Education

at Sambhal District UP under CSR Fund

Training To Self Reliant

Vivid Foundation objective is to make citizens self reliant by nurturing specific skills in them. Latest Technologies and utilisation of available resources is the key to success..

Entrepreneur Development

Entrepreneur are the backbone of any countries economy. Individual entrepreneur can easily contribute into nation's wealth, and if a foundation of large number of entrepreneur...

Women Empowerment

Vivid Foundation actively working in empowering women to have a better life to poor and helpless women particularly widows. Foundation provide free training to them....

Your Nominal Contribution pay more

Foundations endeavour is to skill economically poor youth and women. Most centres are equipped with computer labs and library. We request visiters to donate old books, computers, laptops to us ...

Leather Belt

LEATHER BELT

 

Production capacity/annum :   150,000 Nos

Production process

• Cutting the leather into belts of different sizes
• Cutting of laces
• Weave the belt with these laces into various holes and cut made
• over the belt to give attractive designs.
• Then fixing the buttons and buckles on the belt.

Process flow chart

Strap cutting  ►  Stitching   ► Riveting  ► Punching

Despatch    <  Packing  <  Inspection

Machinery & equipment required

• Strap cutting machine                       1  No.
• Stitching machine                            2   Nos
• Riveting                                          1 No
• Punching                                        1 No
• Working tools                                 3  Set

Raw material/consumables required

• Bark. Tanned Sole leather
• Grinderies (Solution, Thread, Buckles etc.)

Utilities required

Power required(load)   :  10K.W.
Water required (per shift basis)   :   Normal    supply.

Man power required

Supervisor          1 No.
Skilled               2 Nos
Unskilled           5 Nos

Area required

Total Area            250 Sq. Mtr.

Covered Area       200 Sq. Mtr

Investment required

Machinery & Equipment

Working Capital for 3 Months    :   Rs 15.5 lakhs

(Raw material, utilities & salary)


Consectetur Adipisicing

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip

Read More

Consectetur Adipisicing

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip

Read More

Consectetur Adipisicing

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip

Read More

Consectetur Adipisicing

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip

Read More

Consectetur Adipisicing

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip

Read More

Ready to Start?

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor

Buy it now

Our Clients

Contact us

 
Add: 283/53/2, Ground Floor, Mukundpur Delhi 110042, Ph: 011-65446600, 9811442146
Email: develop@vividfoundation.org, vikasch01@gmail.com
JoomShaper