SCHOOL BAG (CANVAS)

 

Production capacity/annum :  15000 pcs.

Production process

The general sequences of operations are as follows:
• Raw material
• Designing and pattern cutting
• Clicking of components
• Attaching lining components with top components
• Stitching
• Zip attaching by stitching
• D-ring. buckles & rivets fitting
• Finishing
• Inspection and packing

Process flow chart

Designing  ►  Pattern Cutting ► Stitching

Packing Other Attachment  Zip Attaching

Machinery & equipment required

• Single needle flat bed sewing machine
• Equipment for screen printing
• Tools and equipment

Raw materiail/consumables required

• Design canvas
• Nylon strap
• D-rings
• Zip & fasteners
• Rivets / fasteners
• Cotton tape
• Buckles
• Locks
• Thread
• Adhesive
• Packing materials

Utilities required

Power required (load)                  :   2KW
Water required (per shift basis)    :   Normal Supply

Manpower required

Supervisor       :  1 No. 
Skilled            :  6 Nos
Unskilled        :  5 Nos

Area required

Total Area          120 Sq. Mtr

Covered Area     l00 Sq.Mtr.

Investment required

Machinery & Equipment

Working Capital for 3 Months  :  Rs 11.55 lakhs

(Raw material, utilities & salary)